Bid Cobra

ITS POLE MNT CAB (TY 3)(CONF 1)(REL)

Engineer's Estimate

Average: $2,562.50
Maximum: $3,000.00
Minimum: $1,000.00

Bid Information

Average Bid: $2,783.72