Bid Cobra

MTL BM GD FEN TRANS (THRIE-BEAM)(OPT1)

Engineer's Estimate

Average: $1,675.00
Maximum: $2,350.00
Minimum: $1,000.00

Bid Information

Average Bid: $1,831.40