SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1)(C)
Engineer's Estimate
Average:
$23,500.00
Maximum:
$25,000.00
Minimum:
$22,000.00
Bid Information
Average Bid:
$26,867.23
