Bid Cobra

PLANT MATERIAL (MIN 14' TRNK HT)(PALM)

Engineer's Estimate

Average: $1,485.00
Maximum: $1,700.00
Minimum: $1,270.00

Bid Information

Average Bid: $1,524.03