Bid Cobra

PLANT MATERIAL (MIN 12' TRNK HT)(PALM)

Engineer's Estimate

Average: $1,450.00
Maximum: $1,450.00
Minimum: $1,450.00

Bid Information

Average Bid: $1,638.35